21 Pearl

Our Portfolio
Project Description

Construction of a five-unit town-home project located in downtown Boulder’s Pearl Street district.

These high-end units included a detached parking structure with individual garages, rooftop patios, private backyards and various premium finishes throughout.

An aerial shot of a commercial building on the portfolio page for an automotive contractor that built a les schwab tire center in fort morgan, co.
An under construction image of the inside of a large commercial garage that was part of a Les Schwab Tire Center built by an automotive contractor in Colorado.
Project Information
Location
Boulder CO
Area
Front Range
Building Size
7,000 SF
Duration
9.0 Months
Building Type
Multifamily
Construction Type
New Construction
Delivery Method
Lump Sum
Owner
Element Properties
Architect
Surround Architecture
Strategy
This project was delivered via a design-assist pre-construction effort followed by a fast construction effort. The hurdles of the project included a tight site and very stringent street closure requirements for material delivery throughout the project. This zero lay down site required just in time delivery and thorough coordination efforts throughout.