This project was a design-assist CM/GC project delivery of a 28,217SF tilt-up flex-industrial project in Dacono, CO.

This project included a thorough preconstruction effort including initial entitlement meetings with the City, weekly design meetings through the evolution of the design, extensive cost alternates and early procurement of key trades. Entering construction Symmetry Builders led a healthy coordination effort to navigate an operational facility on the same property and utility coordination of existing utilities serving both the new and existing facilities. The building is now the home to several tenants utilizing high-bay manufacturing, office, loading and other building components. Symmetry was so ecstatic with the product that we decided to move its headquarters to the building in May of 2018.

An aerial shot of a commercial building on the portfolio page for an automotive contractor that built a les schwab tire center in fort morgan, co.
An under construction image of the inside of a large commercial garage that was part of a Les Schwab Tire Center built by an automotive contractor in Colorado.
Project Information
Location
Dacono, CO
Area
Front Range
Building Size
Site Size: 2.734 acres Building Size: 38,217 SF
Duration
21.8 Months
Building Type
Flex-Industrial
Construction Type
Tilt-Up
Delivery Method
CM/GC
Owner
Resolute Investments, Inc.
Architect
Grey Wolf Architecture
Strategy
This project was ground-up facility used for manufacturing, office, loading and various similarities to Micro Motion’s end building use. The project required a design-assist effort to optimize the budget, schedule and procurement efforts. In addition, there were necessary coordination efforts to incorporate the new building into the existing site and building.