This building was a Tilt up, 13000 SF tilt-up building on footing 10’ over the existing foundation.

Additionally, the scope included five acres of site work, an additional tilt-up storage building, a concrete retaining wall, and a pond with structures. The tilt panels were 12” thick with 2.5” rigid insulation in the middle of the panels with brick poured into the panels. A unique feature of the building was it’s blue radius panel awnings.

An aerial shot of a commercial building on the portfolio page for an automotive contractor that built a les schwab tire center in fort morgan, co.
An under construction image of the inside of a large commercial garage that was part of a Les Schwab Tire Center built by an automotive contractor in Colorado.
Project Information
Location
Lafayette, CO
Area
Front Range
Building Size
13,200 SF
Duration
6.0 Months
Building Type
Industrial | Office | Warehouse
Construction Type
Tilt-Up, New Construction
Delivery Method
GMP
Owner
Panel Masters
Architect
Grey Wolf Architecture
Strategy
Our team started this project in late spring and finished in the fall of the same year, so good weather helped everything go smoothly. Additionally, the site utilities went in at the beginning which allowed us to clear the site early and the moisture from the weather made it easier to work on the site. Interestingly, our team had to have two different panel erections, two crane mobilizations due to the size of the panels and used a hydraulic crane versus a crawler due to site constraints.