This project consisted of a ~4,200 square-foot greenhouse

and improving the site with ADA accessibility from the school to the greenhouse and the school track. They already had two greenhouses on the property, but the previous two were decommissioned once the new greenhouse was substantially complete. The project is located in Weld County which has one of the largest school districts in the state of Colorado. We started work on the greenhouse in January 2021 and finished in May 2021. This project was a lump sum contract, so it was a little bit of a different pace than projects with other contracting methods.

An aerial shot of a commercial building on the portfolio page for an automotive contractor that built a les schwab tire center in fort morgan, co.
An under construction image of the inside of a large commercial garage that was part of a Les Schwab Tire Center built by an automotive contractor in Colorado.
Project Information
Location
Gilcrest, CO
Area
Front Range
Building Size
12,000 SF building, 8,000 SF PEMB
Duration
6.0 Months
Building Type
Greenhouse
Construction Type
New Construction
Delivery Method
Stipulated Sum
Owner
Weld County School District RE-1
Architect
TreanorHL
Strategy
The initial timing of the project was a challenge due to pouring concrete during the coldest and snowiest week of 2021! Due to the frozen temperatures, we utilized ground thawers onsite to thaw the ground which helped the backfill process. When the weather warmed up, we reconditioned the dirt as needed to achieve proper compaction and made sure our tests come back positive. We have certain soil density tests we must pass before we pour the concrete slab, so the warmer weather during the following months was relief. Having the compaction right in the soil helps prevent the slab from settling or heaving over time.