Wildland Fire Station

Our Portfolio
Project Description

Construction of a new 11,268 SF fire station consisting of three drive thru apparatus bays.

The facility will be home to Boulder’s wild land fire crews and will also act as the regional command center in conjunction with the already existing training center facilities. The project includes dormitories, officer offices and gathering areas such as a large commercial kitchen and workout area. The project was USGBC LEED Certified.

An aerial shot of a commercial building on the portfolio page for an automotive contractor that built a les schwab tire center in fort morgan, co.
An under construction image of the inside of a large commercial garage that was part of a Les Schwab Tire Center built by an automotive contractor in Colorado.
Project Information
Location
Boulder, CO
Area
Front Range
Building Size
11,268 SF
Duration
10.0 Months
Building Type
Fire Station | Municipal
Construction Type
New Construction
Delivery Method
Design-Bid-Build
Owner
City of Boulder
Architect
Allred & Associates
Strategy
This project was a design-bid-build delivery so Symmetry Builders, Inc.’s involvement was not until late in the design process. Regardless, Symmetry was able to engage with ALLRED and provide nearly $500,000 in value engineering to bring the project to the owner’s budget. Although there were some value added changes during the construction process, these changes were minimized through providing minimal cost solutions as well as offsetting cost through other scopes to maintain the project budget.