30th & Larimer Mixed-Use

Our Portfolio
Project Description

The 30th & Larimer project included both adaptive-reuse and ground-up construction of three stand-alone facilities on one site.

The project incorporated a ground-up 3-story office building, renovation of an end-of-life 2-story brick building for a brewery and a ground-up pre-engineered metal building for several mixed-use tenants. This building houses Odell Brewing’s small batch brew-house and tap room, Shake Shack, Fierce 45 and numerous office tenants to come. The project incorporated a ground-up 3-story office building, renovation of an end-of-life 2-story brick building for a brewery and a ground-up pre-engineered metal building for several mixed-use tenants. This building houses Odell Brewing Company’s small-batch brew house and tap room, Shake Shack, Fierce 45 and numerous office tenants to come.

An aerial shot of a commercial building on the portfolio page for an automotive contractor that built a les schwab tire center in fort morgan, co.
An under construction image of the inside of a large commercial garage that was part of a Les Schwab Tire Center built by an automotive contractor in Colorado.
Project Information
Location
Denver, CO
Area
Front Range
Building Size
29,750 SF
Duration
12.0 Months
Building Type
Hospitality | Mixed-Use | Office | Retail
Construction Type
Adaptive Re-Use, New Construction
Delivery Method
Cost-Plus GMP
Owner
LCP Development
Architect
Chord Design Studio
Strategy
"The project consisted of three buildings with concurrent construction schedules so site logistics and staging, coordination with inspection authorities, and coordination with end users (tenants) were all project challenges. Symmetry Builders, Inc. was able to staff and run all three projects at the time with no significant hurdles. Furthermore, the three buildings were built using three different construction process: - 2995 Larimer St. is a pre-engineered metal building (Shake Shack). - 2945 Larimer St. is an existing 100-year-old brick building with a wood framed addition (Odell Brewing Company). - 2935 Larimer St. is a traditional structural steel, steel framed office building. Symmetry Builders, Inc. was also able to overcome the site limitations; the three buildings are located in a high-traffic urban area and had tight site restraints which made logistics a key component of success."

We are more than your builder,

we are your partner in success.

 

Upload Files Drag and drop your files here or click the button to upload your files from your computer

multi file upload Drag and drop your files Max Upload: 20 MB
close image preview
image preview
Task already exist for this element.
Write your message in the existing thread.
Here, we opened it for you.
Pushed to Media Folder.
The file was added to the website's media folder, you can now use it from the there.
poweredby
hide sidebar icon
sidebar left
sidebar menu
sidebar menuThis Page
sidebar menuAll Pages
sidebar menuShow Complete Tasks
sidebar menuShow Internal Tasks
sidebar menuSort by Date
sidebar menuSort by Priority
sidebar menuSort by Status
Tasks
Pages
no task in sidebar
Add your comments
Click any part of the page to start collaborating
              Loading...
              ×
              ×
              Approve Page

              When the page is ready, click the green button to signal to the webmaster that <b>this page is approved.

              there was some error. Please try again.
              ×
              Page Approved
              Desktop Tablet Mobile
              Back to Standard View
              You Ran Out of Website Slots

              That's great!
              It means you're growing & onboarding more clients!<br>Don't let it stop you

              There was some error. Please try again.