Brighton Fire Maintenance Facility

Our Portfolio
Project Description

The Brighton Fire Maintenance Facility was a ~9,800 SF ground-up fleet maintenance facility.

This project included six apparatus bays, fluid storage, offices, gear wash, break room, storage mezzanine, surface parking and various other components. The building structure consists of a structural block structure with metal joist roof structure.

An aerial shot of a commercial building on the portfolio page for an automotive contractor that built a les schwab tire center in fort morgan, co.
An under construction image of the inside of a large commercial garage that was part of a Les Schwab Tire Center built by an automotive contractor in Colorado.
Project Information
Location
Brighton, CO
Area
Front Range
Building Size
7,776 SF Main + 1,978 SF Mezzanine
Duration
10.0 Months
Building Type
Fire Station | Municipal
Construction Type
New Construction
Delivery Method
Design-Bid-Build
Owner
Brighton Fire Rescue District
Architect
Allred & Associates
Strategy
Symmetry was short-listed via qualifications then competitively bid the project against several other firms. We then had a brief pre-construction effort before breaking ground in September of 2017.
Symmetry

We are more than your commodity -

We are your partner in success.