Louisville Fire Station & Training Center

Our Portfolio
Project Description

Construction of a new 11,325 sf fire station.

Consisting of 3 drive-thru apparatus bays. The facility included work-out rooms, meeting areas, officer offices and the rough-in for future career fire fighter dorms and an equipment basement. The project also included a multiple story pre-engineered training and burn structure / building.

An aerial shot of a commercial building on the portfolio page for an automotive contractor that built a les schwab tire center in fort morgan, co.
An under construction image of the inside of a large commercial garage that was part of a Les Schwab Tire Center built by an automotive contractor in Colorado.
Project Information
Location
Louisville, CO
Area
Front Range
Building Size
11,325 SF
Duration
9.0 Months
Building Type
Fire Station | Municipal
Construction Type
New Construction
Delivery Method
Lump Sum
Owner
Louisville Fire Department
Architect
Kyle Callahan & Associates
Strategy
Symmetry Builders, Inc. as involved early in the design phase and was able to understand the overall project and work with the entire design team to develop a design within the project budget. This effort has help eliminate any construction coordination or construction detail related changes throughout the project. There was a discrepancy in the soils report identified during the excavation process but Symmetry was able to re-engineer the structure to eliminate any cost increases.
Symmetry

We are more than your commodity -

We are your partner in success.