![9News Article on JCEH Modular Project](https://symmcos.com/wp-content/uploads/2023/07/JCEH-Breckenridge-June2023-29-scaled-e1688406263806-1080x637.jpg)
Symmetry Articles.
Articles
![Brighton Fire Maintenance Facility](https://symmcos.com/wp-content/uploads/2023/01/Brighton-FIre-Feature.jpg)
Brighton Fire Maintenance Facility
The Brighton Fire Maintenance Facility was a ~9,800 SF ground-up fleet maintenance facility.
This project ...
![VEG Denver Veterinary Hospital](https://symmcos.com/wp-content/uploads/2023/01/VEG_Denver_02.jpg)
VEG Denver Veterinary Hospital
Vet Hospital build-out within new core and shell.
Typical MEP & Fire elements, Med Gas for vet usage. ...
![Wildland Fire Station](https://symmcos.com/wp-content/uploads/2023/01/Boulder-Wildlands-Fire-11.jpg)
Wildland Fire Station
Construction of a new 11,268 SF fire station consisting of three drive thru apparatus bays.
The facility will be ...